Background
To deliver a multi-service repair and maintenance contract on a railway bridge over the Trent and Mersey Canal, all managed through one principal point of contact.
The Challenge
Tight project timescales were in place to minimise the duration of the canal closure while work was carried out.
Lead in the paint to be removed increased the complexities of protecting the surrounding environment from lead contamination.
DIS Solution
- Track side possession works
- Decontamination planning due to lead in paint
- Scaffolding and containment
- Design of pontoon system to protect the local environment
- Full steel work rectification
- Blasting and painting
- De-vegetation and masonry repairs