Background

Once the world’s longest suspension bridge, The Humber Bridge was due an inspection to check for signs of corrosion.

The Challenge

Very special access and lifting equipment needed to help instal the main cable inspection platform.

Operatives and equipment needed to be transported vertically to and from the main working platform.

DIS Solution

Specialist access and lifting equipment, and experienced rope access operatives to instal main platform.

A powered feeder cradle installed for vertical transportation.

Use of our 3,000kg capacity traction hoists and back-up safety devices.