High
volume
of work
Background
DIS scope included:
- Scaffold and full encapsulation
- Surface preparation
- Application of protective coatings
- Emergency response and rescue
The Challenge
- High volume of work within v. confined box girders.
- Proximity of ‘non-compatible’ trades – welding, burning and the application of solvent-based paints.
- Viaduct crossed highways and railway lines.
DIS Solution
- Delivered, erected, maintained, dismantled 2,600+ tonnes of scaffold material.
- All material fully encapsulated with double skin containment.
- Surface preparation of 136,000m².